_

Project – Completion of the sewage station in Safaga City – Red Sea Governorate

The station consists of two batteries (two chips) working in parallel and each battery consists of: -

  • Anaerobic lake .
  • Optional lake (reciprocating).
  • 3 maturation lakes running in succession.
  • Canopy building for generators.
  • Administrative building and laboratory.
  • Security room.

The first tranche: - The rehabilitation work for civil works has been completely completed, including:

(1 anaerobic basin - 1 optional basin - 3 maturation basin - 33 distribution rooms).

The second tranche: - Work is underway on the rehabilitation work for civil works for the following segment in full, including:

(1 anaerobic basin - 1 optional basin - 3 maturation basins - 33 distribution rooms - the second budget basin)

_

Project – Completion of the sewage station in Ras Ghareb City – Red Sea Governorate

_

Project – Sewage villages Decent life in Dayrout – Assiut Governorate Kodia Al-Islam Village (Mubarak) – Riyadh Village

First: The village of Kudiya al-Islam consists of:

1 - Regression networks:

  • It consists of a group of branch lines and main lines until the connection on the lifting station with the gradient diameters of the parallels used in the implementation of the network to accommodate the amount of disposal of the region and the gradation of pipes in the sewage slope network came from the diameters of (200 – 250 – 315 – 400 – 500 – 630 – 710) mm with a total network of 31,000 linear meters.
  • It is implemented on identical slope lines, which are circular or square concrete rooms with a total of 1200 applicators.

2 - Expulsion lines:

  • An extrusion line of HDPE polyethylene pipes with a diameter of 560 mm is designed and approved, a pressure of 6 bar and an active test pressure of at least 9 bar with a length of 6,000 linear meters.

3 - Lifting stations:

  • The lifting station of the village of Kudia Al-Islam was designed and approved to accommodate the quantities of sewage from the slope network, and the components of the station were (an internal diameter of 7 meters - an operating ward - the warehouse building - the guard room - the generator umbrella).

Second: Riyadh Village consists of:

1 - Regression networks:

  • It consists of a group of branch lines and main lines until the connection on the lifting station with the gradation of the diameters of the parallels used in the implementation of the network to accommodate the amount of disposal of the region and the gradation of pipes in the sewage slope network came from the diameters of (200 – 250 – 315 – 400) mm with a total network of 5,800 linear meters.
  • It is implemented on identical slope lines, which are circular or square concrete rooms with a total of 220 applicators.

2 - Expulsion lines:

  • An extrusion line of polyethylene HDPE pipes with a diameter of 350 mm pressure of 6 bar and an active test pressure of not less than 9 bar with a length of 2,400 linear meters is designed and approved.

3 - Lifting stations:

  • The lifting station of the village of Kudia Al-Islam was designed and approved to accommodate the quantities of sewage from the slope network and the components of the station were (Bayara internal diameter 4 meters - operating ward - warehouse building - guard room - generator umbrella).